The engineering department is casual; however, long hours might be required during special projects. The down time for a refinery or down stream production is very costly so ever effort is required to return to operational status. An unscheduled lost day can cost a million or more in lost sales.
Generally work hours are 8 to 9 per day but in special projects and field engineering, the hours can exceed 12 per day. Down time is very expensive to a petroleum company so long hours might be required.