
Fair salary and adequate variable incentive bonus potential.
Developing cross- Discipline and cross- Systems solutions to design challenges.
Working with extremely technically competent and professional as well as passionate team solving challenging design problems.
Engineering leadership team, both executive and senior level, is committed to integrity and SQDC as well as rebuilding the Engineering team's technical competency and capacity plus overall professionalism.
Committed to getting the BWRX-300 First Of A Kind (FOAK) design completed for both the Standard Plant Design (SPD) and first Engineer-Procure-Construct (EPC) Reference Plant with OPG DNNP SMR-X Unit 1 of 4.